Description
Client Name:- | Rajesh Kapoor |
Property Location:- | Khar (W) |
Property Type:- | 3 BHK + (2nd Flat Only Bathroom Work) |
Property Status:- | New Building ( Possession 3 BHK =October + 2 nd Flat = July End 2021) |
Service Required On:- | Immediate Service Required |
Budget:- | Looking for the quotation from the Service Providers |
Requirement:- | Requirement 3 BHK Flat Full House Interior Work. A) Living Room: – T.V Unit, Crockery Unit, False Ceiling, Sofa Set, Safety Door, Dining Table, Shoe Rack. B) Kitchen: – Modular Kitchen Interior Work. C) Bedroom 1:- Bed with Side tables, Wardrobe with Overhead Storage, Dressing Table / Study table, False Ceiling. D) Bedroom 2:- Bed with Side tables, Wardrobe with Overhead Storage, Dressing Table / Study table, False Ceiling. E) Bedroom 3:- Bed with Side tables, Wardrobe with Overhead Storage, Dressing Table / Study table, False Ceiling. F) Full House Painting Work. G) Electrical Work Requirement 2 nd Flat Full Bathroom Renovation Work: – Flooring, Water Proofing, Partition Work, Tiling, Plumbing |
Reviews
There are no reviews yet.